Finished both rear and front suspensions this weekend. I think RB6 brakes look good on this car. Also installed RB6 radiators and assembled front wing. As soon as I can force myself to create seat belts (hate it), I should be able to mate body and floor and install rear wing. After that only small accessories will be left. Need to wrap it before end of September.


looking great so far.
ReplyDeleteLovely work... Look forward to seeing it done.
ReplyDelete